Georgia
DataCentersExposed tracks 36 AI data centers in Georgia — 12 operating and 2 in the pipeline — across 8 counties, drawing 2.7 GW of reported power demand from 9 tracked corporate operators. Georgia's data-center tax break cost the state $474.2M in forgone revenue in FY2025.
Sources: Methodology, Coverage scorecard
DataCentersExposed tracks 36 data centers in Georgia — 12 operating, 1 under construction, and 1 proposed. The 8 Georgia facilities with disclosed electrical capacity account for 2.7 GW of demand on the grid — power that competes with homes and businesses for the same generation and transmission.
Reporting by Eric Keller · Updated May 29, 2026
Georgia at a glance
The largest footprint in Georgia belongs to QTS Realty Trust, LLC, behind 10 tracked facilities. Prime Data Centers, Meta Platforms, Inc., and Alphabet Inc. round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.
Geographically, the buildout clusters: Douglas County leads Georgia with 10 facilities and a composite risk score of 34/100. Newton County and Fulton County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.
Georgia is not done growing. 2 facilities are in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.
We also surface the accountability trail: 8 state bills mentioning data centers and 6 recent news items are tracked for Georgia below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.
Top operators in Georgia
The taxpayer price tag
“The Institute estimated forgone state tax revenue of $474.2 million in FY 2025.”
- High-Technology Data Center Equipment Sales and Use Tax Exemption (O.C.G.A. § 48-8-3(68.1)) · FY2025$474.2M
- High-Tech Data Center Equipment Exemption — OPB fiscal-note line (O.C.G.A. § 48-8-3(68.1)) · FY2025proj$41M
- High-Tech Data Center Equipment Exemption — OPB fiscal-note line (O.C.G.A. § 48-8-3(68.1)) · FY2025proj$35M
Program-wide cost of Georgia's data-center tax incentive(s), reported by the state — not attributable to a single facility. “Proj” = the state's own forward estimate; all other figures are realized/audited. Each links to its primary source.
County risk leaderboard
| County | Facilities | Pipeline | Risk |
|---|---|---|---|
| Douglas County | 10 | 1 | 34 |
| Newton County | 5 | — | 23 |
| Fulton County | 15 | — | 16 |
| Cobb County | 2 | — | 16 |
| Fayette County | 5 | — | 8 |
| Gwinnett County | 4 | — | 8 |
| Muscogee County | 2 | 1 | 4 |
| Forsyth County | 1 | — | 4 |
Pipeline & proposals
All tracked facilities
| Facility | Operator | Status | County | MW |
|---|---|---|---|---|
| Columbus Data Center | — | Proposed | Muscogee | — |
| Microsoft East Point — Douglas County | Microsoft Corporation | Under construction | Douglas | 750 |
| Microsoft Fairwater Atlanta | Microsoft Corporation | Mapped (unverified) | Fayette | 859 |
| Meta Newton County | Meta Platforms, Inc. | Mapped (unverified) | Newton | 460 |
| Google Douglas County | Alphabet Inc. | Mapped (unverified) | Douglas | 360 |
| QTS Atlanta Metro | QTS Realty Trust, LLC | Mapped (unverified) | Fulton | 240 |
| Ascent - Atlanta Data Center | Prime Data Centers | Mapped (unverified) | Fulton | — |
| Atlanta ATL13 | Digital Realty Trust, Inc. | Fulton | — | |
| Centersquare Atlanta ATL1 | CenterSquare (formerly Cyxtera) | Douglas | — | |
| CoreSite AT1 | American Tower Corporation | Fulton | — | |
| CoreSite AT2 - Marietta Data Center | American Tower Corporation | Cobb | — | |
| Cox Data Center | Prime Data Centers | Mapped (unverified) | Fulton | — |
| Dli One | — | Mapped (unverified) | Muscogee | — |
| Digital Realty Atlanta ATL11 | Digital Realty Trust, Inc. | Mapped (unverified) | Douglas | — |
| Digital Realty Data Center | Digital Realty Trust, Inc. | Mapped (unverified) | Fulton | — |
| Enterprise Services, LLC | — | Mapped (unverified) | Fulton | — |
| Flexential Corporation | — | Mapped (unverified) | Douglas County | — |
| Flexential Atlanta - Alpharetta Data Center | Flexential Corp. | Fulton | — | |
| Flexential Atlanta - Douglasville 1 | Flexential Corp. | Douglas | — | |
| Flexential Atlanta - Douglasville 2 | Flexential Corp. | Mapped (unverified) | Douglas | — |
| Flexential Atlanta - Norcross | Flexential Corp. | Gwinnett | — | |
| Google, LLC | Alphabet Inc. | DOUGLAS | — | |
| Google Datacenter - Douglas County | Alphabet Inc. | Mapped (unverified) | Douglas | — |
| Google Fiber | Alphabet Inc. | Mapped (unverified) | Fulton | — |
| Hewlett-Packard | — | Mapped (unverified) | Fulton | — |
| Mapletree Industrial | — | Mapped (unverified) | Fulton | — |
| Meta | Meta Platforms, Inc. | Mapped (unverified) | Newton | — |
| Meta | Meta Platforms, Inc. | Mapped (unverified) | Newton | — |
| Meta | Meta Platforms, Inc. | Mapped (unverified) | Newton | — |
| Meta Stanton Springs Data Center | Meta Platforms, Inc. | Mapped (unverified) | Newton | — |
| QTS | QTS Realty Trust, LLC | Mapped (unverified) | Fayette | — |
| QTS | QTS Realty Trust, LLC | Fayette | — | |
| QTS | QTS Realty Trust, LLC | Mapped (unverified) | Fayette | — |
| QTS | QTS Realty Trust, LLC | Mapped (unverified) | Fayette | — |
| QTS Atlanta Data Center 1 | QTS Realty Trust, LLC | Fulton | — | |
| QTS Atlanta Data Center 2 | QTS Realty Trust, LLC | Mapped (unverified) | Fulton | — |
| QTS Suwanee | QTS Realty Trust, LLC | Mapped (unverified) | Gwinnett | — |
| QTS Suwanee Data Center 1 | QTS Realty Trust, LLC | Gwinnett | — | |
| QTS Suwanee Data Center 2 | QTS Realty Trust, LLC | Mapped (unverified) | Gwinnett | — |
| Secure Data Center | Prime Data Centers | Mapped (unverified) | Fulton | — |
| Strategic Datasphere | — | Mapped (unverified) | Fulton | — |
| Switch Data Center | Prime Data Centers | Mapped (unverified) | Douglas | — |
| T5 Data Center | Prime Data Centers | Fulton | — | |
| UPS Data Center | Prime Data Centers | Mapped (unverified) | Forsyth | — |