Douglas County, Georgia

DataCentersExposed tracks 8 AI data centers in Douglas County, Georgia — 3 operating and 1 in the pipeline, drawing 1.1 GW of reported power demand, led by Alphabet Inc.. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Douglas County, Georgia has 8 tracked data centers, 3 of them operating and 1 in the development pipeline. Its composite data-center risk score is 34 out of 100 — see the breakdown above for which factors drive it.

Facilities
8
Operating
3
Pipeline
1

Reporting by · Updated May 29, 2026

Risk breakdown
34Moderate
  • Project exposure · 22
  • Power demand · 50
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Douglas County

Facilities here with disclosed capacity draw 1.1 GW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

Alphabet Inc. has the largest presence in Douglas County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

8 facilities

Every tracked facility

FacilityOperatorStatusMW
Microsoft East Point — Douglas CountyMicrosoft CorporationUnder construction750
Google Douglas CountyAlphabet Inc.Mapped (unverified)360
Centersquare Atlanta ATL1
Lithia Springs
CenterSquare (formerly Cyxtera)Operating
Digital Realty Atlanta ATL11
Austell
Digital Realty Trust, Inc.Mapped (unverified)
Flexential Corporation
DOUGLASVILLE
Mapped (unverified)
Flexential Atlanta - Douglasville 1
Douglasville
Flexential Corp.Operating
Google, LLC
LITHIA SPRINGS
Alphabet Inc.Operating
Switch Data Center
Lithia Springs
Prime Data CentersMapped (unverified)
Accountability

County commissioners

How the Douglas County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.