Microsoft East Point — Douglas County

Douglas County, GA

Microsoft East Point — Douglas County is a under construction data center in Douglas County, GA, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. DataCentersExposed has documented 750 MW of reported power capacity at this site.

Reporting by · Updated Jun 14, 2026

Campaign · Decision pending

Take action

Douglas, Georgia

0
supporters

A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Power & your bill

750 MW of new demand — roughly a city of 600,000 homes.

Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in GA is 15.0¢/kWh, up 2.2% year-over-year. (MW→homes is a rough ~800/MW planning figure.)

Source
Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
Microsoft Corporation
Operator
Microsoft Data Center LLC
Power
750 MW
Utility
Greystone Power Corporation
Grid
SOCO
Attribution & capacity confidence:mediumprovenance JSON
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

Microsoft East Point is a hyperscale data center under construction in Douglas County, Georgia, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. The project reports a power capacity of 750 MW, drawing electricity from Greystone Power Corporation within the SOCO balancing authority.

Operator chain

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Microsoft Corporation (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2023 · term yr · source
  • Qualified Data Center Sales Tax Exemption$0
    State of Wisconsin · granted 2023 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2021 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2015 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2013 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2013 · term yr · source
Statewide cost of this incentive

Georgia reported $474.2M in High-Technology Data Center Equipment Sales and Use Tax Exemption (O.C.G.A. § 48-8-3(68.1)) for FY2025 (Georgia Department of Audits and Accounts (DOAA); economic analysis by UGA Carl Vinson Institute of Government). Program-wide, not attributable to this site.

source · All Georgia subsidies →

Water use

Modeled estimate~15.5M gpd
Direct (onsite cooling)
~7.6M gpd
Indirect (its electricity)
~7.9M gpd

No measured record exists, so this is a low-confidence model from 750 MW (disclosed IT power): 2 L/kWh cooling (hot climate) + 0.55 gal/kWh embedded in SOCO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
60
PM2.5
Moderate
49
O3
Good
19
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Atlanta), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$83.3K
People of color
59%
Below poverty
16%
Tract population
4,764

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Yeager Middle School in Douglasville, is 0.3 mi from this site (542 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.