Google, LLC
300 RIVERSIDE PARKWAY SW · LITHIA SPRINGS, DOUGLAS County, GA
Source: Primary source
Google, LLC is an operating data center in DOUGLAS County, GA, operated by Google LLC and ultimately owned by Alphabet Inc..
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkThis is an operating Google LLC data center in Lithia Springs, Douglas County, Georgia, owned through its parent, Alphabet Inc. The site draws power from Greystone Power Corporation within the SOCO balancing authority. Capacity and footprint figures are not disclosed in available records.
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityGoogle, LLC
In the news
source: GDELT- Google funds Flint River wetlands restoration project in Georgia while its data center expansion continues - CBS NewsCBS News· Jun 8, 2026
- Amid data center backlash, Google gives $1M for South Georgia wetlands - The Rome News-TribuneThe Rome News-Tribune· Jun 8, 2026
- Amid data center backlash, Google gives $1 million for South Georgia wetlands - Hartwell SunHartwell Sun· Jun 11, 2026
- Amid data center backlash, Google gives $1M for South Georgia wetlands - Statesboro HeraldStatesboro Herald· Jun 10, 2026
- Amid data center backlash, Google gives $1M for South Georgia wetlands - WABEWABE· Jun 5, 2026
- New Google data center planned for LaGrange in Troup County - FOX 5 AtlantaFOX 5 Atlanta· Apr 22, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286Ellis County, TX · granted 2024 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346Ellis County, TX · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2018 · term — yr · source
Georgia reported $474.2M in High-Technology Data Center Equipment Sales and Use Tax Exemption (O.C.G.A. § 48-8-3(68.1)) for FY2025 (Georgia Department of Audits and Accounts (DOAA); economic analysis by UGA Carl Vinson Institute of Government). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Environmental permits
source: Permit register- GOOGLE, LLCGA0038920
- Clean Air Act permitted sourceGA0000001309700061NAICS 518210 999999; ECHO compliance status: No Violation Identified
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Atlanta), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Riverside Elementary School in Mableton, is 3.1 mi from this site (559 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.