Meta Platforms, Inc.

DataCentersExposed tracks 49 data centers operated by Meta Platforms, Inc. across 17 states, of which 4 are proposed or under construction, with 6.8 GW of reported power capacity. Meta Platforms, Inc. has filed or built under 13 project codenames resolved here, including Balloonist LLC, DB Stu LLC, Goat Systems LLC.

Sources: SEC EDGAR, GLEIF LEI

Reporting by

Facilities
49
tracked
States
17
footprint
Pipeline
4
proposed / building
Reported power
6.8 GW
Codename decoder

Project codenames & aliases

Names this operator has filed or built under. We resolve them back to Meta Platforms, Inc. so a search for the codename finds the real company.

  • Balloonist LLC
  • DB Stu LLC
  • Goat Systems LLC
  • J5 LLC
  • Laidley LLC
  • Liames LLC
  • Orla LLC
  • Pelican Leap LLC
  • Raven Northbrook LLC
  • SICULUS LLC
  • Shaytura LLC
  • Toreak Acquisition Corp
  • Wurldwide LLC
49 facilities

Where Meta Platforms, Inc. builds

FacilityLocationStatusMW
Meta Jeffersonville (proposed)INProposed700
Meta Louisiana Data CenterLAProposed
Meta El Paso Data CenterEl Paso, TXUnder construction1,000
Meta — Loudoun buildAshburn, VAUnder construction600
Meta Fort WorthFort Worth, TXOperating700
Meta Mesa CampusMesa, AZMapped (unverified)700
Meta AltoonaAltoona, IAMapped (unverified)540
Meta PrinevillePrineville, ORMapped (unverified)540
Meta PapillionPapillion, NEMapped (unverified)480
Meta Eagle MountainEagle Mountain, UTMapped (unverified)460
Meta Newton CountySocial Circle, GAMapped (unverified)460
Meta New AlbanyOHMapped (unverified)420
Meta KunaKUNA, IDMapped (unverified)198
Facebook Altoona Data Center 2IAMapped (unverified)
Facebook Altoona Data Center 5IAMapped (unverified)
Facebook Fort Worth DatacenterTXMapped (unverified)
MetaILMapped (unverified)
MetaILMapped (unverified)
MetaOHMapped (unverified)
MetaLos Lunas, NMMapped (unverified)
MetaOHMapped (unverified)
MetaOHMapped (unverified)
MetaIAMapped (unverified)
MetaGAMapped (unverified)
MetaORMapped (unverified)
MetaORMapped (unverified)
MetaORMapped (unverified)
Meta Clonee 1 Data CenterMapped (unverified)
Meta Clonee 2 Data CenterMapped (unverified)
Meta Clonee 3 Data CenterMapped (unverified)
Meta Clonee 5 Data CenterMapped (unverified)
Meta Clonee 6 Data CenterMapped (unverified)
Meta Eagle Mountain Data CenterUTMapped (unverified)
Meta Gallatin Data CenterTNMapped (unverified)
Meta Gallatin Data CenterTNMapped (unverified)
Meta Henrico Data CenterVAMapped (unverified)
Meta Henrico Data CenterVAMapped (unverified)
Meta MontgomeryMONTGOMERY, ALMapped (unverified)
Meta Odense Data CenterMapped (unverified)
Meta Odense Data centerOperating
Meta RosemountROSEMOUNT, MNMapped (unverified)
Meta Sarpy Data centerNEMapped (unverified)
Meta Sarpy Data centerNEMapped (unverified)
Meta Sarpy Data centerNEMapped (unverified)
Meta Singapore Data CenterSingaporeMapped (unverified)
Meta Stanton Springs Data CenterSocial Circle, GAMapped (unverified)
Metas datacenter i LuleåMapped (unverified)
Metas datacenter i LuleåMapped (unverified)
Metas datacenter i LuleåLuleåMapped (unverified)
Federal lobbying

Lobbying Washington

via Senate LDA
Reported spend
$84M
2022–2026
Filings
18
on data-center / energy issues
PeriodLobbyist / firmIssuesAmount
2026
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$7.1Mfiling
2026
MCGINLEY LLC
Energy / nuclear
$90Kfiling
2026
STEWART STRATEGIES AND SOLUTIONS, LLC
TelecomLAWIntelligenceComputers / internet
$60Kfiling
2026
MEHLMAN CONSULTING, INC.
Energy / nuclear
$50Kfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$8.0Mfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$6.5Mfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$6.0Mfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$5.8Mfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$5.8Mfiling
2025
CAPITOL TAX PARTNERS, LLP
Taxes
$60Kfiling
2024
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$7.6Mfiling
2024
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$5.9Mfiling

Amounts are each filing's total reported lobbying by Meta Platforms, Inc. (or firms it retained) for quarters in which data-center, energy, water, or tax issues were lobbied — not a data-center-only figure. Source: U.S. Senate Office of Public Records.

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.