Meta
Licking County, OH
Source: OpenStreetMap
Meta is a mapped data center in Licking County, OH, operated by Facebook USA, Inc. and ultimately owned by Meta Platforms, Inc.. DataCentersExposed has documented a 365,548 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkA mapped Meta data center in Licking County, Ohio, the 365,548 square foot site is operated by Facebook USA, Inc., a subsidiary ultimately owned by Meta Platforms, Inc. It draws power from Licking Rural Electric INC and sits within the PJM grid.
Operator chain
- Ultimate parentMeta Platforms, Inc.
- Files asFacebook USA, Inc.
- This facilityMeta
In the news
source: Google News- US Army Warns Lawmakers Draft Legislation Risks Data Center PushBloomberg· Jun 5, 2026
- AI Data Center Boom Risks Breakup of Biggest US Power Grid OperatorBloomberg· Jun 4, 2026
- Did Mark Zuckerberg's data center 'dry up' Rio Grande? Here's what records showSnopes· Jun 4, 2026
- China fueling anti-data center sentiment across US, Trump admin and ‘Shark Tank’ star Kevin O’Leary claimNew York Post· May 29, 2026
- AI data centre power surge threatens US grid stability and consumer costsGreen Building Africa· May 22, 2026
- Balancing Data Center Growth with American Agriculture | Market IntelAmerican Farm Bureau Federation· Apr 23, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Meta Platforms, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
Ohio reported $130.4M in Sales/use tax exemption for qualified property used in an eligible computer data center (R.C. § 122.175) for FY2024 (Ohio Department of Taxation / Office of Budget and Management). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site cleared at the PJM-wide (RTO) price, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~70 to 150 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Columbus), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Licking Heights High School in Pataskala, is 2.2 mi from this site (1,389 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.