County data-center profile

Santa Clara County, California

DataCentersExposed tracks 39 AI data centers in Santa Clara County, California — 16 operating and 0 in the pipeline, drawing 1.0 GW of reported power demand, led by American Tower Corporation. Its transparent data-center risk score is 1/100.

Sources: Methodology, Coverage scorecard

Santa Clara County, California has 39 tracked data centers, 16 of them operating. Its composite data-center risk score is 61 out of 100 — see the breakdown above for which factors drive it.

Facilities
39
Operating
16
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
61High
  • Project exposure · 64
  • Power demand · 57
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Santa Clara County

Facilities here with disclosed capacity draw 1.0 GW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

American Tower Corporation has the largest presence in Santa Clara County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

39 facilities

Every tracked facility

FacilityOperatorStatusMW
Equinix Silicon Valley Campus
San Jose
Equinix, Inc.Mapped (unverified)380
CoreSite Real Estate 3032 Coronado, L.P.
Santa Clara
American Tower CorporationMapped (unverified)345
STACK Infrastructure
San Jose
Stack Infrastructure, Inc.Mapped (unverified)118
CoreSite Real Estate 55 S. Market Street
San Jose
American Tower CorporationMapped (unverified)78
CoreSite Real Estate 1656 McCarthy, L.P.
Milpitas
American Tower CorporationMapped (unverified)50
VantageVantage Data Centers Holdings, LLCOperating45
AmazonAmazon.com, Inc.Mapped (unverified)
Cologix Santa Clara SV1 Data CenterCologix, Inc.Operating
ColovoreMapped (unverified)
Csquare SFO3
Sunnyvale
CenterSquare (formerly Cyxtera)Operating
DataBank Santa Clara SFO1
Santa Clara
DataBank Holdings, Ltd.Operating
Dell 350 Holger Way
San Jose
Mapped (unverified)
Digital Realty Silicon Valley SC1
Santa Clara
Digital Realty Trust, Inc.Operating
Digital Realty Silicon Valley SJC16
Santa Clara
Digital Realty Trust, Inc.Operating
Digital Realty Silicon Valley SJC34Digital Realty Trust, Inc.Operating
EdgeCore Silicon ValleyOperating
Equinix SV11
San Jose
Equinix, Inc.Mapped (unverified)
Equinix SV15
Santa Clara
Equinix, Inc.Mapped (unverified)
Equinix SV4
Sunnyvale
Equinix, Inc.Operating
Equinix SV6
Sunnyvale
Equinix, Inc.Operating
Equinix SV8
Palo Alto
Equinix, Inc.Operating
Equinix San Jose SV3
San Jose
Equinix, Inc.Operating
Equinix Santa Clara SV2
Santa Clara
Equinix, Inc.Operating
Evocative Santa Clara SJC11Operating
Forescout Technologies, Inc.
San Jose
Mapped (unverified)
Layer42 Santa ClaraMapped (unverified)
Lumen Sunnyvale 1
Sunnyvale
Lumen Technologies, Inc.Operating
Microsoft
Santa Clara
Microsoft CorporationMapped (unverified)
NTT Limited
San Jose
NTT Global Data CentersMapped (unverified)
NTT Silicon Valley SV1 Data Center
Santa Clara
NTT Global Data CentersMapped (unverified)
Northwest Data Center and Communications Hub
Stanford
Mapped (unverified)
OpenColo
Santa Clara
Operating
Prime SANTA CLARA DATA CENTERPrime Data CentersMapped (unverified)
Prime Santa ClaraMapped (unverified)
Prime Santa ClaraMapped (unverified)
QTS Santa Clara 2QTS Realty Trust, LLCMapped (unverified)
Stack Svy02Stack Infrastructure, Inc.Mapped (unverified)
SV Colo
Santa Clara
Mapped (unverified)
Vantage Santa Clara CA2
Santa Clara
Vantage Data Centers Holdings, LLCMapped (unverified)
Accountability

County commissioners

How the Santa Clara County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.