Skip to content
DataCentersExposed
ultimate parent

Stack Infrastructure, Inc.

⚑ Withholds its owner

Stack Infrastructure, Inc. told the global LEI registry that it has a parent company but declined to name it (parent is non-public). Most data-center operators with a parent disclose it; this one does not. GLEIF Level-2

DataCentersExposed tracks 19 data centers operated by Stack Infrastructure, Inc. across 6 states, of which 1 is proposed or under construction, with 718 MW of reported power capacity.

Source: GLEIF LEI

Reporting by

Facilities
19
tracked
States
6
footprint
Pipeline
1
proposed / building
Reported power
718 MW
19 facilities

Where Stack Infrastructure, Inc. builds

FacilityLocationStatusMW
Stack Temple CampusTemple, TXUnder construction600
STACK InfrastructureSan Jose, CAMapped (unverified)118
Gen01Plan-les-OuatesMapped (unverified)
Rechenzentrum EllhofenEllhofenMapped (unverified)
Rechenzentrum OstermiethingOstermiethingMapped (unverified)
STACK Chicago CHI01ILMapped (unverified)
STACK Infrastructure Data Center - SI NVA06A LLCVAOperating
STACK Infrastructure OSL04Mapped (unverified)
Stack Mill1aMapped (unverified)
Stack Mill1bMapped (unverified)
Stack Mill2Mapped (unverified)
STACK NVA01A - Northern VirginiaVAMapped (unverified)
STACK New AlbanyOHMapped (unverified)
Stack Svy02CAMapped (unverified)
Stack Infrastructure - POR01Hillsboro, ORMapped (unverified)
Stack Infrastructure - POR02Hillsboro, OROperating
Stack Infrastructure MEL01AMapped (unverified)
Stack Infrastructure MEL01BMapped (unverified)
Stack Infrastructure OSLO1AMapped (unverified)
Federal lobbying

Lobbying Washington

via Senate LDA
Reported spend
$830K
2024–2026
Filings
9
on data-center / energy issues
PeriodLobbyist / firmIssuesAmount
2026
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$100Kfiling
2025
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$110Kfiling
2025
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$100Kfiling
2025
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$90Kfiling
2025
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$80Kfiling
2024
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$150Kfiling
2024
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$100Kfiling
2024
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$100Kfiling
2024
AKIN GUMP STRAUSS HAUER & FELD
Energy / nuclearComputers / internet
filing

Amounts are each filing's total reported lobbying by Stack Infrastructure, Inc. (or firms it retained) for quarters in which data-center, energy, water, or tax issues were lobbied — not a data-center-only figure. Source: U.S. Senate Office of Public Records.

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.