Stack Temple Campus
Temple, Bell County, TX
Stack Temple Campus is a under construction data center in Bell County, TX, operated by Stack Infrastructure, Inc.. DataCentersExposed has documented 600 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 15, 2026
Take action
Bell, Texas
A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
600 MW of new demand — roughly a city of 480,000 homes.
Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in TX is 16.4¢/kWh, up 7.3% year-over-year. (MW→homes is a rough ~800/MW planning figure.)
SourceDemand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
Stack Temple Campus is a hyperscale data center under construction in Temple, Bell County, Texas, operated by Stack Infrastructure, Inc. The site carries a reported power capacity of 600 MW and would draw from the ERCOT grid. Its status and ultimate corporate ownership remain points worth tracking as the project advances.
Operator chain
- Ultimate parentStack Infrastructure, Inc.
- This facilityStack Temple Campus
In the news
source: Google News- Adani, Jabil join hands to build world-class AI data centre infra manufacturing platform in IndiaIANS LIVE· Jun 15, 2026
- Worries over water as a giant data center moves into the New Mexico desertNPR· Jun 14, 2026
- Zoho debuts India-built Nathu La server with plans to reduce data centre and AI spendingFirstpost· Jun 10, 2026
- 'It's not built yet': Yakama Nation fights $3.3B energy project and data center development on sacred siteStreet Roots· May 20, 2026
- Local leaders approve $100B AI data campus in Pittsylvania County amid citizen concernsWSET· May 18, 2026
- New details out on massive data center planned in Pittsylvania CountyWDBJ7· Apr 30, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 600 MW (disclosed IT power): 2 L/kWh cooling (hot climate) + 0.4 gal/kWh embedded in ERCOT grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Waco-Killeen), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Leon Heights El in Belton, is 1.6 mi from this site (216 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.