Vantage
Santa Clara County, CA
Source: OpenStreetMap
Vantage is an operating data center in Santa Clara County, CA, operated by Vantage Data Centers Holdings, LLC. DataCentersExposed has documented 45 MW of reported power capacity and a 89,293 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkVantage operates this colocation data center in Santa Clara County, California, run by Vantage Data Centers Holdings, LLC. The operating site reports a power capacity of 45 MW across a footprint of 89,293 square feet, drawing electricity from the City of Santa Clara within the CISO balancing authority.
Operator chain
- Ultimate parentVantage Data Centers Holdings, LLC
- Files asVantage Data Centers Holdings, LLC
- This facilityVantage
The grid behind this site, right now
source: CAISO · gridstatus- Solar53.3%
- Imports14.6%
- Wind10.5%
- Nuclear7.1%
- Hydro6.3%
- Natural Gas4.5%
- Geothermal2.4%
- Biomass1.3%
Real-time generation mix for the CAISO grid this site draws from, as of Jun 16, 2026, 2:45 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: Google News- After Virginia approved a gas-powered data center without public input, residents turned to a local environmental group for answersDC News Now· Jun 9, 2026
- Malaysia’s AI data centre boom enters mission-critical phaseThe Malaysian Reserve· Jun 2, 2026
- Poland Data Center Market Investment Analysis Report 2026-2031 Featuring Atman, Beyond.pl, Data4, Equinix, Netia, Orange Business, Polcom, T-Mobile, Vantage Data Centers, and 3S GroupYahoo Finance· May 14, 2026
- Poland Data Center Market Investment Analysis ReportGlobeNewswire· May 14, 2026
- Wisconsin utility company executive says more data centers could be on the horizonWPR· May 7, 2026
- Amid ‘constant' data center noise, Sterling residents also worry about health impactNBC4 Washington· Apr 15, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Vantage Data Centers Holdings, LLC (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2021 · term — yr · source
Water use
No measured record exists, so this is a low-confidence model from 45 MW (disclosed IT power): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (San Jose), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Bracher Elementary in Santa Clara, is 0.5 mi from this site (236 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.