Microsoft data center, Santa Clara

2055 Lafayette Street · Santa Clara, Santa Clara County, CA

Source: OpenStreetMap

Microsoft data center in Santa Clara County, CA is a mapped facility, operated by Microsoft Corporation. DataCentersExposed has documented a 166,655 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Microsoft Corporation
Operator
Microsoft Corporation
Est. capacity
~30-70 MW
Footprint
166,655 sq ft
Interconnection
~37 MW
Utility
City of Santa Clara
Grid
CISO
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

This is a mapped hyperscale data center in Santa Clara, Santa Clara County, California, run by Microsoft Corporation. Public records put its footprint at 166,655 square feet. The site draws power from the City of Santa Clara utility inside the CISO balancing authority.

Operator chain

The grid behind this site, right now

source: CAISO · gridstatus
Clean right now
81%
Fossil right now
4%
Grid operator
CAISO
  • Solar53.3%
  • Imports14.6%
  • Wind10.5%
  • Nuclear7.1%
  • Hydro6.3%
  • Natural Gas4.5%
  • Geothermal2.4%
  • Biomass1.3%

Real-time generation mix for the CAISO grid this site draws from, as of Jun 16, 2026, 2:45 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Microsoft Corporation (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2023 · term yr · source
  • Qualified Data Center Sales Tax Exemption$0
    State of Wisconsin · granted 2023 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2021 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2015 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2013 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2013 · term yr · source

Water use

Modeled estimate~695K gpd
Direct (onsite cooling)
~375.3K gpd
Indirect (its electricity)
~319.7K gpd

No measured record exists, so this is a low-confidence model from 37 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
59
PM2.5
Moderate
33
O3
Good

Air Quality Index from the nearest AirNow reporting area (San Jose), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$138.4K
People of color
76%
Below poverty
17%
Tract population
8,473

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Scott Lane Elementary in Santa Clara, is 0.7 mi from this site (396 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.