U.S. data-center footprint

North Carolina

DataCentersExposed tracks 20 AI data centers in North Carolina — 5 operating and 1 in the pipeline — across 8 counties, drawing 5.6 GW of reported power demand from 6 tracked corporate operators.

Sources: Methodology, Coverage scorecard

DataCentersExposed tracks 20 data centers in North Carolina — 5 operating and 1 proposed. The 6 North Carolina facilities with disclosed electrical capacity account for 5.6 GW of demand on the grid — power that competes with homes and businesses for the same generation and transmission.

Reporting by · Updated May 29, 2026

Tracked
20
data centers
Operating
5
live today
Pipeline
1
proposed / building
Demand
5.6 GW
6 w/ capacity
Counties
8
touched
Operators
6
corporate parents
The story so far

North Carolina at a glance

The largest footprint in North Carolina belongs to Flexential Corp., behind 3 tracked facilities. Apple Inc., Alphabet Inc., and Meta Platforms, Inc. round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Wake County leads North Carolina with 5 facilities and a composite risk score of 52/100. Catawba County and Caldwell County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

North Carolina is not done growing. 1 facility is in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 1 state bill mentioning data centers and 6 recent news items are tracked for North Carolina below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Who's building

Top operators in North Carolina

Where it's concentrated

County risk leaderboard

Risk methodology
Still contested

Pipeline & proposals

23 of 20 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Lee County Data CenterProposedLee
Tract Apex Campus (withdrawn)TractBlockedWake4,500
Apple MaidenApple Inc.Mapped (unverified)Catawba480
Google LenoirAlphabet Inc.Mapped (unverified)Catawba360
CoreWeave Marble NCMapped (unverified)Cherokee91
Apple - Maiden Data CenterApple Inc.Mapped (unverified)Catawba
BB&T Data CenterPrime Data CentersMapped (unverified)Wake
Brandaleone Lab for Data and VisualizationMapped (unverified)Durham
Flexential Charlotte - NorthFlexential Corp.OperatingMecklenburg
Flexential Charlotte - SouthFlexential Corp.OperatingMecklenburg
Flexential RaleighFlexential Corp.OperatingWake
Google Data CenterAlphabet Inc.Mapped (unverified)Caldwell
Level 3 CommunicationsMapped (unverified)Durham
MetaMeta Platforms, Inc.Mapped (unverified)Rutherford
MetaMeta Platforms, Inc.Mapped (unverified)Rutherford
SegraMapped (unverified)Mecklenburg
Segra Data CenterPrime Data CentersMapped (unverified)Wake
Spectrum Charlotte National Data CenterMapped (unverified)Mecklenburg
T5 Charlotte CampusOperatingCleveland
Tapaha Dynamics, LLCMapped (unverified)Caldwell
TierPoint - Charlotte Data CenterTierPoint, LLCOperatingMecklenburg
Windstream CommunicationsMapped (unverified)Durham
iGLASS NetworksMapped (unverified)Wake

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.