Tract Apex Campus (withdrawn)

Apex, Wake County, NC

Tract Apex Campus (withdrawn) is a blocked data center in Wake County, NC, operated by Tract. DataCentersExposed has documented 4,500 MW of reported power capacity at this site.

Reporting by · Updated Jun 12, 2026

Campaign · Stopped — for now

Take action

Wake, North Carolina

0
supporters

This project was denied or withdrawn. Stay joined — these proposals often come back in a new form.

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Power & your bill

4,500 MW of new demand — roughly a city of 3,600,000 homes.

Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in NC is 16.0¢/kWh, up 8.1% year-over-year. (MW→homes is a rough ~800/MW planning figure.)

Source
Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
Tract
Operator
Tract
Power
4,500 MW
Utility
Town of Apex
Grid
CPLE
Attribution & capacity confidence:mediumprovenance JSON
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

Apex Town Council voted unanimously to deny rezoning July 2024 after 800-person opposition turnout.

Operator chain

  • Ultimate parent
    Tract
  • This facility
    Tract Apex Campus (withdrawn)

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~80M gpd
Direct (onsite cooling)
~41.1M gpd
Indirect (its electricity)
~38.9M gpd

No measured record exists, so this is a low-confidence model from 4,500 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
61
PM2.5
Moderate
38
O3
Good
19
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Wake County), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$103.6K
People of color
34%
Below poverty
4%
Tract population
3,107

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Apex Middle in Apex, is 0.3 mi from this site (905 students). 3 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.