Google Lenoir
Lenoir, Catawba County, NC
Google Lenoir is a mapped data center in Catawba County, NC, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 360 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
Google Lenoir is a hyperscale data center in Lenoir, Catawba County, NC, operated by Google LLC and ultimately owned by Alphabet Inc. Operational since 2009, the site carries a reported power capacity of 360 MW, drawing electricity from Blue Ridge Elec Member Corp within the DUK balancing authority.
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityGoogle Lenoir
In the news
source: GDELTTax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286Ellis County, TX · granted 2024 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346Ellis County, TX · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2018 · term — yr · source
Water use
- Reported consumption922.7K gpd2023 · consumption · reported as “Google Lenoir” · source
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Caldwell County), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Davenport A+ School in Lenoir, is 668 ft from this site (464 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.