Illinois

DataCentersExposed tracks 38 AI data centers in Illinois — 23 operating and 1 in the pipeline — across 6 counties, drawing 1.9 GW of reported power demand from 15 tracked corporate operators.

Sources: Methodology, Coverage scorecard

DataCentersExposed tracks 38 data centers in Illinois — 23 operating and 1 proposed. The 23 Illinois facilities with disclosed electrical capacity account for 1.9 GW of demand on the grid — power that competes with homes and businesses for the same generation and transmission.

Reporting by · Updated May 29, 2026

Tracked
38
data centers
Operating
23
live today
Pipeline
1
proposed / building
Demand
1.9 GW
23 w/ capacity
Counties
6
touched
Operators
15
corporate parents
The story so far

Illinois at a glance

The largest footprint in Illinois belongs to Digital Realty Trust, Inc., behind 6 tracked facilities. NTT Global Data Centers, CenterSquare (formerly Cyxtera), and Equinix, Inc. round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Cook County leads Illinois with 27 facilities and a composite risk score of 21/100. DuPage County and DeKalb County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Illinois is not done growing. 1 facility is in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 8 state bills mentioning data centers and 6 recent news items are tracked for Illinois below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Who's building

Top operators in Illinois

What the tax break costs

The taxpayer price tag

via Illinois Department of Commerce and Economic Opportunity (DCEO)
$983.2Mcumulative (state projection)
Totals 27 $8,106,549,576 $15,731,146,724 $983,196,670 591 11 [column header: 'Est. Value of Tax Benefits']. 'While the estimated tax benefit is calculated at approximately 6.25% of total investment to represent the value of the State's sale…

Program-wide cost of Illinois's data-center tax incentive(s), reported by the state — not attributable to a single facility. “Proj” = the state's own forward estimate; all other figures are realized/audited. Each links to its primary source.

Where it's concentrated

County risk leaderboard

Risk methodology
CountyFacilitiesPipelineRisk
Cook County2721
DuPage County1415
DeKalb County37
Champaign County14
Lake County14
Christian County11
Still contested

Pipeline & proposals

47 of 38 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Eagle Rock Christian County Data CenterProposedChristian1,000
Aligned Data Center - Chicago ORD-01Aligned Energy Holdings, LPMapped (unverified)Cook
Aligned Data Center - Chicago ORD-02Aligned Energy Holdings, LPOperatingCook
Centersquare Chicago Data Center - ORD1CenterSquare (formerly Cyxtera)OperatingCook
Centersquare Elk Grove Village Data Center Campus ORD2CenterSquare (formerly Cyxtera)OperatingDuPage
Centersquare Lisle ORD4 Data CenterCenterSquare (formerly Cyxtera)OperatingDuPage
CoreSite Chicago Data Center (CH1)American Tower CorporationOperatingCook
CoreSite Chicago Data Center (CH2)American Tower CorporationOperatingCook
CyrusOne CHI3CyrusOne LLCMapped (unverified)DuPage
CyrusOne Chicago Aurora CMECyrusOne LLCOperatingDuPage
Datacenter (386)Mapped (unverified)DuPage
Digital Realty CH1Digital Realty Trust, Inc.OperatingCook
Digital Realty CH2Digital Realty Trust, Inc.OperatingCook
Digital Realty CH3Digital Realty Trust, Inc.OperatingCook
Digital Realty Chicago ORD12Digital Realty Trust, Inc.OperatingCook
Digital Realty ORD10Digital Realty Trust, Inc.OperatingCook
Digital Realty ORD11Digital Realty Trust, Inc.OperatingCook
EdgeConneX CHI01EdgeConneX, Inc.Mapped (unverified)Cook
EdgeConneX CHI02EdgeConneX, Inc.OperatingCook
Edged Chicago ORD01Mapped (unverified)DuPage
Element Critical CH1Element CriticalOperatingDuPage
Element Critical CH2Element CriticalOperatingDuPage
Equinix Chicago CH3Equinix, Inc.OperatingCook
Equinix Chicago Data CH7Equinix, Inc.OperatingDuPage
Equinix Chicago Data Center - CH1Equinix, Inc.OperatingCook
Iron Mountain Data & Record StorageIron Mountain IncorporatedMapped (unverified)Cook
Lakeside Technology CenterMapped (unverified)Cook
Lincoln RackhouseOperatingDuPage
MetaMeta Platforms, Inc.Mapped (unverified)DeKalb
MetaMeta Platforms, Inc.Mapped (unverified)DeKalb
MetaMeta Platforms, Inc.Mapped (unverified)DeKalb
Microsoft - Azure DatacenterMicrosoft CorporationMapped (unverified)Cook
NCSA Petascale Computing FacilityMapped (unverified)Champaign
NTT Chicago CH1NTT Global Data CentersMapped (unverified)DuPage
NTT Chicago CH2NTT Global Data CentersMapped (unverified)DuPage
NTT Chicago CH3NTT Global Data CentersMapped (unverified)DuPage
NTT Chicago CH4NTT Global Data CentersMapped (unverified)DuPage
NetralityOperatingCook
QTS ChicagoQTS Realty Trust, LLCOperatingCook
STACK Chicago CHI01Stack Infrastructure, Inc.Mapped (unverified)Cook
Serverfarm CH1OperatingCook
Skybox Chicago IMapped (unverified)Cook
Stream Chicago IStream Data CentersOperatingCook
Stream Chicago IIStream Data CentersOperatingCook
T5 Chicago IIOperatingCook
VisaMapped (unverified)Lake
West MonroeMapped (unverified)Cook

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.