Equinix Chicago Data CH7
DuPage County, IL
Source: OpenStreetMap
Equinix Chicago Data CH7 is an operating data center in DuPage County, IL, operated by Equinix, Inc.. DataCentersExposed has documented a 47,336 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkEquinix Chicago Data CH7 is an operating colocation data center in DuPage County, Illinois, run by Equinix, Inc. Its reported footprint is 47,336 square feet. The site draws power from Commonwealth Edison Co inside the PJM grid.
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix Chicago Data CH7
In the news
source: Google News- New Equinix lab lets companies trial Cisco-NVIDIA AI setups before going all-inStock Titan· Jun 16, 2026
- Equinix Collaborates with Cisco and NVIDIA to Deploy Secure AI Factories Across Global Data Center FootprintTradingView· Jun 16, 2026
- How Cloud Connectivity is Evolving with Equinix Geo ZonesData Centre Magazine· Jun 16, 2026
- Loudoun students tour Equinix data center in AshburnLoudoun Times-Mirror· Jun 12, 2026
- Equinix Cape Town data centre plans face oppositionTelecompaper· Jun 9, 2026
- South Africa faces calls to block U.S.-listed firm's entry into Africa's largest data centre marketBusiness Insider Africa· Jun 5, 2026
Data-center discussions in DuPage County
source: LocalView (CC0)Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Equinix, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2022 · term — yr · source
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2022 · term — yr · source
Illinois reported $983.2M in Data Center Investment Program — state & local sales/use tax exemption (20 ILCS 605/605-1025; administered by DCEO) (2019-2024 (27 certified data centers; cumulative estimated exemption value)) (Illinois Department of Commerce and Economic Opportunity (DCEO)). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's COMED pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~5 to 20 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (South and West Suburbs (Chicago)), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Westmont Jr High School in Westmont, is 0.6 mi from this site (301 students). 5 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.