Asia · data-center footprint
Japan
DataCentersExposed tracks 63 AI data centers in Japan — 1 operating and 0 in the pipeline — across 18 prefectures, run by 17 tracked operators.
Sources: Methodology, Coverage scorecard
What powers Japan's data centers
Ember · 2025Carbon intensity
477
gCO₂/kWh
Clean electricity
renewables + nuclear
Fossil electricity
67%
coal, gas & oil
Grid demand
1030
TWh / year
Demand growth
per year
Tracked
63
Operating
1
In pipeline
0
Reported power
110 MW
prefectures
18
Operators
17
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
By prefecture
Where the data centers are
Facilities
Tracked data centers
- 2B棟Tokyo · AirTrunk50 MWMapped (unverified)
- 2A棟Tokyo · AirTrunk30 MWMapped (unverified)
- 2C棟Tokyo · AirTrunk30 MWMapped (unverified)
- Mapped (unverified)
- Americable DatacenterKanagawaMapped (unverified)
- Colt ShiohamaTokyoMapped (unverified)
- Colt 京阪奈データセンターKyoto · Colt Data Centre ServicesMapped (unverified)
- EquinixOsaka · Equinix, Inc.Mapped (unverified)
- EquinixChiba · Equinix, Inc.Mapped (unverified)
- EquinixTokyo · Equinix, Inc.Mapped (unverified)
- Equinix TY3Tokyo · Equinix, Inc.Mapped (unverified)
- Equinix Tokyo TY11Tokyo · Equinix, Inc.Mapped (unverified)
- Equinix Tokyo TY5Tokyo · Equinix, Inc.Mapped (unverified)
- Google 印西データセンターChiba · Alphabet Inc.Mapped (unverified)
- IijShimane · IIJMapped (unverified)
- Kagoya データセンター A棟KyotoMapped (unverified)
- Kagoya データセンター B棟KyotoMapped (unverified)
- Kddi千倉海底線中継所Chiba · KDDIMapped (unverified)
- Mcデジタル・リアルティ Nrt10Chiba · MCデジタル・リアルティMapped (unverified)
- Mcデジタル・リアルティ Nrt12Chiba · MCデジタル・リアルティMapped (unverified)
- NTTOsaka · NTT Global Data Centers
- NTT DocomoTokyo · NTT Global Data CentersMapped (unverified)
- NTT DocomoOsaka · NTT Global Data CentersMapped (unverified)
- NTT Tk2TokyoMapped (unverified)
- NTT Tk9TokyoMapped (unverified)
- NTTドコモKagawaMapped (unverified)
- NTT市川中山ビルChiba · NTT Global Data CentersMapped (unverified)
- NTT東日本 小曽木電話交換局Tokyo · NTT Global Data CentersMapped (unverified)
- NTT武蔵村山電話交換局Tokyo · NTT Global Data CentersMapped (unverified)
- Next-MIC DataCenterKagoshimaMapped (unverified)
- RakutenTokyoMapped (unverified)
- SCSK netXDCChibaMapped (unverified)
- STNetKagawa · STNetMapped (unverified)
- STNetEhime · STNetMapped (unverified)
- TisOsaka · TISMapped (unverified)
- TokaiコミュニケーションズOkayama · TOKAIコミュニケーションズMapped (unverified)
- TokaiコミュニケーションズShizuoka · TOKAIコミュニケーションズMapped (unverified)
- TYO2 Tokyo Data CenterTokyo · Digital EdgeMapped (unverified)
- TYO3 Tokyo Data CenterTokyo · Digital EdgeMapped (unverified)
- netXDCHyogo · SCSKMapped (unverified)
- ほくでん情報テクノロジー株式会社HokkaidoMapped (unverified)
- エネコムHiroshimaMapped (unverified)
- スーパーコンピュータ「富岳」HyogoMapped (unverified)
- ドコモOkayama · NTT Global Data CentersMapped (unverified)
- リモートセンシングデータ解析室IwateMapped (unverified)
- 三菱総研dcsChibaMapped (unverified)
- 京阪奈データセンターKyotoMapped (unverified)
- 富士通Miyagi · FujitsuMapped (unverified)
- 情報基盤センターIwateMapped (unverified)
- 日立Okayama · HitachiMapped (unverified)
- 東京第6データセンターTokyo · NTT Global Data CentersMapped (unverified)
- 東日本電信電話株式会社Nagano · NTT Global Data CentersMapped (unverified)
- 株式会社i・tecソリューションズHokkaido · 株式会社I・TECソリューションズMapped (unverified)
- 株式会社アット東京Tokyo · AT TOKYOMapped (unverified)
- 株式会社HBAHokkaidoMapped (unverified)
- 西日本電話電信白島ビルOsakaMapped (unverified)
- 西東京データセンター 1号棟TokyoMapped (unverified)
- 西東京データセンター 2号棟TokyoMapped (unverified)
- 野村総合研究所 東京第一DCTokyoMapped (unverified)
- 電算NaganoMapped (unverified)
- 電算NaganoMapped (unverified)
- 高知信用金庫バックアップセンターKochiMapped (unverified)
- SCSK株式会社Osaka · SCSKMapped (unverified)
In the local press
Latest Japan data-center coverage
- レーザー・フォトニクス株、データセンター向け機器受注で22%急騰 執筆Investing.com - FX | 株式市場 | ファイナンス | 金融ニュース· Jun 16, 2026
- DAデイビッドソン、データセンター成長を背景にリーガル・レクスノードを買い推奨で開始 執筆Investing.com - FX | 株式市場 | ファイナンス | 金融ニュース· Jun 16, 2026
- VisionWave、イスラエルのデータセンタープロジェクトの51%持分取得へ 執筆Investing.com - FX | 株式市場 | ファイナンス | 金融ニュース· Jun 16, 2026
- 「AI時代の本当の勝負所はグラフィック処理装置(GPU)そのものではない。 複雑なインフラをどれだけ早く簡単に連結し運営するかがカギだ」シスコの年次カンファレンス「シスコライブ2026」が開催された6..매일경제· Jun 16, 2026
- 【ITmedia NEWS】データセンターの見回り業務をロボットに 自在に伸びるカメラでくまなく点検できる「ugo mini」について掲載ugo.plus· Jun 16, 2026
- クアルコム、AI半導体新興テンストレント買収を検討 最大100億ドル規模でデータセンター市場へ攻勢finance.biggo.jp· Jun 16, 2026
Live headlines via Google News — in English and Japan's local press.