Mapped (unverified)
Next-MIC DataCenter
Kagoshima, Japan
Source: OpenStreetMap
Next-MIC DataCenter is a mapped data center in Kagoshima, Japan. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Kagoshima
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: link南日本情報処理センター data center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- Data centre policy will be in next London Plan, City Hall saysBBC· Mar 5, 2026
- New connection policy for data centres in IrelandArthur Cox LLP· Dec 16, 2025
- CRU Publishes Long Awaited Final Policy on Data Centre ConnectionsWilliam Fry· Dec 15, 2025
- A humming annoyance or jobs boom? Life next to 199 data centres in VirginiaBBC· Oct 26, 2025
- Data centres to be expanded across UK as concerns mountBBC· Aug 15, 2025
- 'I can't drink the water' - life next to a US data centreBBC· Jul 10, 2025