SCSK data center, Osaka, Japan
Osaka, Japan
Source: OpenStreetMap
SCSK data center in Osaka, Japan is a mapped facility, operated by SCSK. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkThis is a mapped data center in Japan operated by SCSK, listed in available records as the SCSK Corporation data center. No ultimate parent, power capacity, footprint, or environmental enforcement records appear in available records, and its operational details remain undisclosed.
Operator chain
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- 再編続く大手SIer系データセンターの現在地 AIによる電力コスト高騰にどう応えるか (1/2)ASCII.jp· Mar 13, 2026
- インテル® Xeon® プロセッサーを採用したSCSKのクラウドサービス「USiZE」が実現するハイブリッドクラウド・ソブリンクラウドマイナビニュース· Dec 18, 2025
- SCNXを活用しAWSとOCI間のマルチクラウド接続で小売業の夜間バッチ処理時間の短縮を実現scsk.jp· Sep 11, 2025
- SCSK、データセンター用の汎用機を刷新 IBMの新機種に日本経済新聞· Aug 27, 2025
- お客様のメインフレーム・トランスフォーメーションの実現に向け国内初のIBM z17ホスティングサービスとして「MF+ホスティングサービス(IBM z17)」の提供を開始 | SCSK株式会社のプレスリリースPR TIMES· Aug 27, 2025
- SCSK、メインフレーム「IBM z17」導入でマネージドインフラサービスZDNET Japan· Aug 27, 2025