Skip to content
DataCentersExposed
Mapped (unverified)

TOKAIコミュニケーションズ data center, Shizuoka, Japan

Shizuoka, Japan

Source: OpenStreetMap

TOKAIコミュニケーションズ data center in Shizuoka, Japan is a mapped facility, operated by TOKAIコミュニケーションズ. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
TOKAIコミュニケーションズ
Operator
TOKAIコミュニケーションズ
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Shizuoka
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

This is a mapped data center in Japan operated by TOKAIコミュニケーションズ. Available records identify it only as a TOKAIコミュニケーションズ data center, with no ultimate parent disclosed. No power capacity, footprint, or environmental enforcement records appear in the available record.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%

National grid context, not this facility's own metering. Full country picture: Japan data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.