Japan · prefecture
Tokyo
DataCentersExposed tracks 22 AI data centers in Tokyo, Japan — 0 operating and 0 in the pipeline — drawing 110 MW of reported power demand from 5 tracked operators.
Sources: Japan, Methodology
Tracked
22
Operating
0
In pipeline
0
Reported power
110 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- 2B棟AirTrunk50 MWMapped (unverified)
- 2A棟AirTrunk30 MWMapped (unverified)
- 2C棟AirTrunk30 MWMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- EquinixEquinix, Inc.Mapped (unverified)
- Equinix TY3Equinix, Inc.Mapped (unverified)
- Equinix Tokyo TY11Equinix, Inc.Mapped (unverified)
- Equinix Tokyo TY5Equinix, Inc.Mapped (unverified)
- NTT DocomoNTT Global Data CentersMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- NTT東日本 小曽木電話交換局NTT Global Data CentersMapped (unverified)
- NTT武蔵村山電話交換局NTT Global Data CentersMapped (unverified)
- Mapped (unverified)
- TYO2 Tokyo Data CenterDigital EdgeMapped (unverified)
- TYO3 Tokyo Data CenterDigital EdgeMapped (unverified)
- 東京第6データセンターNTT Global Data CentersMapped (unverified)
- 株式会社アット東京AT TOKYOMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
In the local press
Tokyo data-center coverage
- 東京・日野市で「大規模データセンター計画」 近隣住民の不安のワケは? Ben Shelton (9NDDBOHjiG)Mshale· Jun 16, 2026
- 東京・有明に3.3万㎡のデータセンターと1.9万㎡のホテル、設計は戸田と大成建設通信新聞Digital· Jun 15, 2026
- AIとインターネットの次章。 Interop Tokyo 2026、いよいよ明日開幕finders.me· Jun 9, 2026
- Interop Tokyo 2026、明日開幕 AI・宇宙・データセンターの現在地を幕張で体感(FINDERS)Yahoo!ニュース· Jun 9, 2026
- データセンターの排熱の有効活用に向けたスタートアップ、データセンター事業者の公募|6月metro.tokyo.lg.jp· Jun 9, 2026
- 能美防災-東海東京が目標株価を引き上げ データセンター建設など良好な受注環境が続く見通し〔DZH 個別株情報〕(時事通信)Yahoo!ファイナンス· Jun 3, 2026
Live headlines via Google News — in English and Japan's local press.