Skip to content
DataCentersExposed
Mapped (unverified)

Google data center, Pottawattamie County, IA

Pottawattamie County, IA

Source: OpenStreetMap

Google data center in Pottawattamie County, IA is a mapped facility, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 284 MW of reported power capacity and a 2,304,743 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Alphabet Inc.
Operator
Google LLC
Power
284 MW
Footprint
2,304,743 sq ft
Interconnection
~75 MW
Utility
Midamerican Energy Co
Grid
MISO
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

This mapped data center in Pottawattamie County, Iowa, is operated by Google LLC and ultimately owned by Alphabet Inc. The site spans 2,304,743 square feet with a reported power capacity of 284 MW. It draws electricity from Midamerican Energy Co and sits within the MISO grid.

Operator chain

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
53%
Fossil right now
41%
Grid operator
MISO
  • Coal20.8%
  • Wind20.7%
  • Natural Gas19.9%
  • Solar18.2%
  • Nuclear14.6%
  • Imports4.0%
  • Other1.8%

Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 2:45 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Total to this operator: $31.7M
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286
    Ellis County, TX · granted 2024 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346
    Ellis County, TX · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2018 · term yr · source

Water use

Modeled estimate~5.6M gpd
Direct (onsite cooling)
~2.6M gpd
Indirect (its electricity)
~3M gpd

No measured record exists, so this is a low-confidence model from 284 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
41
O3
Good
41
PM2.5
Good
28
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Omaha), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$47.1K
People of color
20%
Below poverty
19%
Tract population
3,091

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Longfellow Elementary School in Council Bluffs, is 1.4 mi from this site (481 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.