Google data center, Pottawattamie County, IA

Pottawattamie County, IA

Source: OpenStreetMap

Google data center in Pottawattamie County, IA is a mapped facility, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 296,835 sq ft footprint at this site.

Reporting by · Updated Jun 16, 2026

Real parent
Alphabet Inc.
Operator
Google LLC
Est. capacity
~55-120 MW
Footprint
296,835 sq ft
Interconnection
~75 MW
Utility
Midamerican Energy Co
Grid
MISO
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Google data center

Operator chain

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
54%
Fossil right now
42%
Grid operator
MISO
  • Wind21.6%
  • Natural Gas21.4%
  • Coal20.5%
  • Solar18.4%
  • Nuclear14.1%
  • Imports2.2%
  • Other1.8%

Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Total to this operator: $31.7M
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286
    Ellis County, TX · granted 2024 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346
    Ellis County, TX · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2018 · term yr · source

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Titan Hill Intermediate School in Council Bluffs, is 3.4 mi from this site (863 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.