Google data center, Pottawattamie County, IA
Pottawattamie County, IA
Source: OpenStreetMap
Google data center in Pottawattamie County, IA is a mapped facility, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 294,718 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkA mapped data center in Pottawattamie County, Iowa, the site is operated by Google LLC and ultimately owned by Alphabet Inc. The facility covers 294,718 square feet and draws power from Midamerican Energy Co, drawing on a grid managed by the MISO balancing authority.
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityGoogle data center
The grid behind this site, right now
source: MISO · gridstatus- Wind21.6%
- Natural Gas21.4%
- Coal20.5%
- Solar18.4%
- Nuclear14.1%
- Imports2.2%
- Other1.8%
Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: GDELT- Palo town hall on proposed Google data center draws pointed questions - Corridor Business JournalCorridor Business Journal· Mar 26, 2026
- Iowa data center owner calls Google’s water use claims ‘BS’ - Iowa Starting LineIowa Starting Line· Jun 4, 2026
- Google funds Iowa water projects amid data center criticisms - The Des Moines RegisterThe Des Moines Register· Jun 3, 2026
- Palo city council advances Google data center ordinance - KCRGKCRG· Jun 1, 2026
- Palo council to hold public hearing on Google data center ordinance - KCRGKCRG· May 29, 2026
- News | Google plans $15 billion data center investment in Missouri - CoStarCoStar· May 21, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286Ellis County, TX · granted 2024 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346Ellis County, TX · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2018 · term — yr · source
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Omaha), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Titan Hill Intermediate School in Council Bluffs, is 3.3 mi from this site (863 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.