Digital Realty Data Center is a mapped data center in Maricopa County, AZ, operated by Digital Realty Trust, Inc.. DataCentersExposed has documented a 67,568 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Digital Realty Trust, Inc.
Operator
Digital Realty Trust, Inc.
Est. capacity
~10-30 MW
Footprint
67,568 sq ft
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Digital Realty Data Center is a mapped colocation site in Tempe, Maricopa County, Arizona, run by Digital Realty Trust, Inc. Public records put its footprint at 67,568 square feet. No ultimate parent above Digital Realty Trust is identified in available records.

Operator chain

Data-center discussions in Maricopa County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

Phoenix Committee
Jun 14, 2023 · 1 data-center mention
Chandler City Council
Oct 14, 2021 · 1 data-center mention
Chandler City Council
Sep 14, 2020 · 1 data-center mention

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Digital Realty Trust, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2014 · term yr · source
Statewide cost of this incentive

Arizona reported $38.5M in Computer Data Center TPT/Use Tax Exemption (Deduction Code 565; A.R.S. § 41-1519) for FY2025 (Arizona Department of Revenue, Office of Economic Research and Analysis). Program-wide, not attributable to this site.

source · All Arizona subsidies →

Water use

Modeled estimate~106.6K gpd
Direct (onsite cooling)
~63.4K gpd
Indirect (its electricity)
~43.2K gpd

No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 2.5 L/kWh cooling (arid climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
43
O3
Good
24
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Gila River Indian Community), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$147.5K
People of color
25%
Below poverty
2%
Tract population
2,539

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Center For Educational Excellence in Tempe, is 0.9 mi from this site (319 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.