Stream Phoenix

2950 LITCHFIELD RD BYP, GOODYEAR, AZ, 85395 · GOODYEAR, Maricopa County, AZ

Source: Primary source

Stream Phoenix is a mapped data center in Maricopa County, AZ. DataCentersExposed has documented 77 MW of reported power capacity at this site.

Reporting by · Updated Jun 13, 2026

Real parent
Operator
Power
77 MW
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Stream Phoenix — frontier AI data center campus tracked by Epoch AI. Estimated capital cost ~$2.4B (2025 USD). Located from Epoch AI's Frontier Data Centers dataset (CC-BY 4.0); operational status not independently verified.

Data-center discussions in Maricopa County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

Phoenix Committee
Jun 14, 2023 · 1 data-center mention
Chandler City Council
Oct 14, 2021 · 1 data-center mention
Chandler City Council
Sep 14, 2020 · 1 data-center mention

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Arizona reported $38.5M in Computer Data Center TPT/Use Tax Exemption (Deduction Code 565; A.R.S. § 41-1519) for FY2025 (Arizona Department of Revenue, Office of Economic Research and Analysis). Program-wide, not attributable to this site.

source · All Arizona subsidies →

Water use

Modeled estimate~1.6M gpd
Direct (onsite cooling)
~976.4K gpd
Indirect (its electricity)
~665.3K gpd

No measured record exists, so this is a low-confidence model from 77 MW (disclosed IT power): 2.5 L/kWh cooling (arid climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
61
O3
Moderate
61
PM2.5
Moderate
61
PM10
Moderate

Air Quality Index from the nearest AirNow reporting area (Phoenix), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$132.3K
People of color
46%
Below poverty
6%
Tract population
3,538

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Palm Valley Preschool in Goodyear, is 0.6 mi from this site. 9 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.