Skip to content
DataCentersExposed
U.S. data-center footprint

Nebraska

DataCentersExposed tracks 19 AI data centers in Nebraska — 1 operating and 1 in the pipeline — across 3 counties, drawing 1.4 GW of reported power demand from 3 tracked corporate operators. Nebraska's data-center tax break is projected to cost the state $5.7M in forgone revenue in FY2025.

Sources: Methodology, Coverage scorecard

DataCentersExposed tracks 19 data centers in Nebraska — 1 operating and 1 under construction. The 6 Nebraska facilities with disclosed electrical capacity account for 1.4 GW of demand on the grid — power that competes with homes and businesses for the same generation and transmission.

Reporting by · Updated May 29, 2026

Tracked
19
data centers
Operating
1
live today
Pipeline
1
proposed / building
Demand
1.4 GW
6 w/ capacity
Counties
3
touched
Operators
3
corporate parents
The story so far

Nebraska at a glance

The largest footprint in Nebraska belongs to Alphabet Inc., behind 7 tracked facilities. Meta Platforms, Inc. and Verizon Communications Inc. round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Sarpy County leads Nebraska with 15 facilities and a composite risk score of 37/100. Douglas County and Buffalo County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Nebraska is not done growing. 1 facility is in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 4 state bills mentioning data centers and 6 recent news items are tracked for Nebraska below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Who's building

Top operators in Nebraska

What the tax break costs

The taxpayer price tag

via Nebraska Department of Revenue
$5.7Min forgone state revenue, FY2025 (state projection)
5. Data Centers Statutory citation: 77-2704.62 ... Estimate: $5,667,000 Data source: U.S. Census Bureau, Economic Census

Program-wide cost of Nebraska's data-center tax incentive(s), reported by the state — not attributable to a single facility. “Proj” = the state's own forward estimate; all other figures are realized/audited. Each links to its primary source.

Where it's concentrated

County risk leaderboard

Risk methodology
CountyFacilitiesPipelineRisk
Sarpy County15137
Douglas County712
Buffalo County14
Still contested

Pipeline & proposals

23 of 19 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Google PapillionAlphabet Inc.Under constructionSarpy600
Meta PapillionMeta Platforms, Inc.Mapped (unverified)Sarpy480
1623 FarnamOperatingDouglas
Compute NorthMapped (unverified)Buffalo
Fireball Group LLC Data CenterMapped (unverified)Sarpy
FidelityMapped (unverified)Sarpy
First National Technical CenterMapped (unverified)Douglas
GoogleAlphabet Inc.Mapped (unverified)Sarpy
GoogleAlphabet Inc.Mapped (unverified)Douglas
GoogleAlphabet Inc.Mapped (unverified)Sarpy
GoogleAlphabet Inc.Mapped (unverified)Sarpy
GoogleAlphabet Inc.Mapped (unverified)Douglas
GoogleAlphabet Inc.Mapped (unverified)Douglas
Meta Sarpy Data centerMeta Platforms, Inc.Mapped (unverified)Sarpy
Meta Sarpy Data centerMeta Platforms, Inc.Mapped (unverified)Sarpy
Meta Sarpy Data centerMeta Platforms, Inc.Mapped (unverified)Sarpy
Meta Sarpy Data centerMeta Platforms, Inc.Mapped (unverified)Sarpy
Meta Sarpy Data centerMeta Platforms, Inc.Mapped (unverified)Sarpy
Raven Northbrook LLCMapped (unverified)Sarpy
Travelers InsuranceMapped (unverified)Sarpy
Union Pacific Jack Koraleski Technology, Research & Development CenterMapped (unverified)Douglas
Verizon WirelessVerizon Communications Inc.Mapped (unverified)Douglas
YahooMapped (unverified)Sarpy

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.