Skip to content
DataCentersExposed
North America · data-center footprint

Mexico

DataCentersExposed tracks 28 AI data centers in Mexico — 0 operating and 0 in the pipeline — across 10 states, run by 10 tracked operators.

Sources: Methodology, Coverage scorecard

What powers Mexico's data centers

Ember · 2025
Carbon intensity
474
gCO₂/kWh
Clean electricity
26%
renewables + nuclear
Fossil electricity
74%
coal, gas & oil
Grid demand
357
TWh / year
Demand growth
+1.4%
per year

Mexico's electricity demand has grown +1.4%/yr (2015–2025). Every new data center competes for that same grid — already 169 MtCO₂ a year from generation.

Tracked
28
Operating
0
In pipeline
0
Reported power
0 MW
states
10
Operators
10
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

By state

Where the data centers are

Facilities

Tracked data centers

In the local press

Latest Mexico data-center coverage

Live headlines via Google News — in English and Mexico's local press.