Mapped (unverified)
Grupo IDDEA
Jalisco, Mexico
Source: OpenStreetMap
Grupo IDDEA is a mapped data center in Jalisco, Mexico. DataCentersExposed has documented a 92,027 sq ft footprint at this site. It runs on Mexico's grid, which was 74% fossil-fuelled at 474 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~15-40 MW
Footprint
92,027 sq ft
Grid carbon
474 gCO₂/kWh
Clean electricity
26%
Region
Jalisco
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
474 gCO₂/kWh
Clean electricity
26%
Fossil electricity
74%
National grid context, not this facility's own metering. Full country picture: Mexico data centers.
In the news
source: Google News (local + English)- China usa el océano para enfriar servidores y reducir gasto de energía: la idea serviría en ciudades comoValora Analitik· Jun 16, 2026
- En medio de la sequía, crece la preocupación ante el centro de datos en el condado Box ElderTelemundo Utah· May 22, 2026
- Vistra Corp (VST)GBM· May 4, 2026
- Mediterra DataCenters anuncia centros de datos en cinco ciudades de España para 2028Valencia Plaza· Apr 11, 2026
- Bezos planea un centro de datos de 51 mil satélitesRedUSERS· Mar 20, 2026
- CoolIT: de gaming a enfriar la IA por $3.000MEcosistema Startup· Mar 15, 2026