Mexico · state
Nuevo León
DataCentersExposed tracks 4 AI data centers in Nuevo León, Mexico — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 3 tracked operators.
Sources: Mexico, Methodology
Tracked
4
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- Centro de datos Equinix MO1Equinix, Inc.Mapped (unverified)
- Centro de datos Equinix MO2Equinix, Inc.Mapped (unverified)
- Centro de datos KIO MTY1KIO NetworksMapped (unverified)
- Centro de datos TriaraTriaraMapped (unverified)
In the local press
Nuevo León data-center coverage
- Querétaro concentra 72% de la capacidad instalada de centros de datosEl Economista· May 14, 2026
- Afecta energía a data centersReforma· May 4, 2026
- Axtel operará data center del Tec de Monterrey durante 12 añosMilenio· Apr 22, 2026
- Ikusi abre oficinas y CDT en MonterreyInfochannel· Mar 27, 2026
- KIO invertirá 70 millones de dólares en nuevo centro de datos MEX8 en Ciudad de MéxicoCluster Industrial· Mar 10, 2026
- Se posiciona México como nodo estratégico para la infraestructura digitalBien Informado· Feb 4, 2026
Live headlines via Google News — in English and Mexico's local press.