Mapped (unverified)
Wavehouse
Heidelberg, Baden-Württemberg, Germany
Source: OpenStreetMap
Wavehouse is a mapped data center in Baden-Württemberg, Germany. DataCentersExposed has documented a 5,599 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Footprint
5,599 sq ft
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Baden-Württemberg
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkEuropas größtes 3D-gedrucktes Gebäude
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Medialine übernimmt Systemhausgeschäft von Heidelberg ITChannelPartner.de· May 18, 2026
- Frühere Daimler-Zentrale: Neues Rechenzentrum – So will Stuttgart von US-Konzernen unabhängiger werdenstuttgarter-nachrichten.de· Feb 24, 2026
- Nexspace kündigt mit Standort Stuttgart einen Wachstumskurs anDataCenter-Insider· Feb 5, 2026
- Schicht für Schicht in die ZukunftGerman Design Council· Apr 22, 2025
- Neues Rechenzentrum der Uni Mannheim: Neubau in den StartlöchernMannheimer Morgen· Sep 11, 2024
- Erfolgreiches Kundenevent bei Heidelberg iT: Ein Abend voller Innovation und UnterhaltungPresseBox· Jul 31, 2024