Germany · Land
Baden-Württemberg
DataCentersExposed tracks 21 AI data centers in Baden-Württemberg, Germany — 1 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 8 tracked operators.
Sources: Germany, Methodology
Tracked
21
Operating
1
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- Mapped (unverified)
- EVF-DatacenterEnergieversorgung FilstalMapped (unverified)
- ForHLR IISteinbuch Centre for ComputingMapped (unverified)
- Höchstleistungsrechenzentrum der Universität StuttgartUniversity of Stuttgart
- IRZ-HIP-HeidelbergData Center GroupMapped (unverified)
- JH-Computers GmbHJH-Computers GmbHMapped (unverified)
- LEITWERK Rechenzentrum AppenweierLeitwerk Rechenzentren Appenweier/Lahr GmbHMapped (unverified)
- Mapped (unverified)
- Rechenzentrum EllhofenStack Infrastructure, Inc.Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- euNetworks ColoCentre KarlsruheeuNetworks GmbHMapped (unverified)
In the local press
Baden-Württemberg data-center coverage
- KI-Rechenzentrum in Neckarwestheim: Gebäude soll sich in Landschaft einfügenStimme· Apr 6, 2026
- AOK Baden-Württemberg: Scanacs darf Papierrezepte direkt abrechnenPharmazeutische Zeitung· Feb 9, 2026
- BaWü: Ein Versorgungsvertrag für die Rechenzentren?Deutsche Apotheker Zeitung, DAZ· Jan 15, 2026
- BaWü: AOK zahlt 90 Prozent vorabApotheke Adhoc· Dec 23, 2025
- Neuer Liefervertrag: AOK zahlt höheren AbschlagPharmazeutische Zeitung· Dec 17, 2025
- Neckarsulmer Schwarz-Gruppe und Telekom planen gemeinsame KI-GigafactorySWR· Dec 1, 2025
Live headlines via Google News — in English and Germany's local press.