Skip to content
DataCentersExposed
Mapped (unverified)

IRZ-HIP-Heidelberg

Heidelberg, Baden-Württemberg, Germany

Source: OpenStreetMap

IRZ-HIP-Heidelberg is a mapped data center in Baden-Württemberg, Germany, operated by Data Center Group. DataCentersExposed has documented a 7,912 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Data Center Group
Operator
Data Center Group
Footprint
7,912 sq ft
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Baden-Württemberg
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

IRZ-HIP-Heidelberg is a mapped data center in Heidelberg, Germany, operated by Data Center Group. Available records put its footprint at 7,912 square feet. No ultimate parent or further ownership details are disclosed in the available records.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh

A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Germany data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.