Vantage VA12
45194 Vantage Data Plaza · Sterling, Loudoun County, VA
Source: OpenStreetMap
Vantage VA12 is a mapped data center in Loudoun County, VA, operated by Vantage Data Centers Holdings, LLC. DataCentersExposed has documented a 115,613 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 16, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkVantage VA12 is a mapped colocation data center in Sterling, Loudoun County, Virginia, run by Vantage Data Centers Holdings, LLC. Records put its footprint at 115,613 square feet. The site draws power from Virginia Electric & Power Co inside the PJM grid.
Operator chain
- Ultimate parentVantage Data Centers Holdings, LLC
- Files asVantage Data Centers Holdings, LLC
- This facilityVantage VA12
In the news
source: Google News- Big Tech takes a drubbing in AlbanyPolitico· Jun 14, 2026
- After Virginia approved a gas-powered data center without public input, residents turned to a local environmental group for answersDC News Now· Jun 9, 2026
- Politicians avoid calling for data center bans despite public oppositionFinance & Commerce· Jun 8, 2026
- Voters back first-in-nation permanent data center ban in city near L.A.The Washington Post· Jun 5, 2026
- See where diesel-powered data center generators are polluting VirginiaThe Washington Post· May 28, 2026
- For residents of Virginia’s ‘data center alley,’ the industry underpins economy — but with costsTribLIVE.com· May 16, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Vantage Data Centers Holdings, LLC (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2021 · term — yr · source
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~20 to 50 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Northern Virginia), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Guilford Elementary in Sterling, is 1.2 mi from this site (541 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.