Skip to content
DataCentersExposed
Operatingcolocation

Vantage Data Centers

45130 Vantage Data Plaza · Sterling, Loudoun County, VA

Source: OpenStreetMap

Vantage Data Centers is an operating data center in Loudoun County, VA, operated by Vantage Data Centers Holdings, LLC. DataCentersExposed has documented a 127,578 sq ft footprint and 2 tracked EPA enforcement records at this site.

Reporting by · Updated Jun 12, 2026

Real parent
Vantage Data Centers Holdings, LLC
Operator
Vantage Data Centers Holdings, LLC
Est. capacity
~25-55 MW
Footprint
127,578 sq ft
Interconnection
~75 MW
Utility
Virginia Electric & Power Co
Grid
PJM
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Vantage Data Centers data center

Operator chain

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Vantage Data Centers Holdings, LLC (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for this record.
  • The Climate Change Agreement$0
    HMRC, United Kingdom · granted 2021 · term yr · source
Statewide cost of this incentive

Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.

source · All Virginia subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO
  • Clean Air Actno penalty
    formal · reported 2026-05-21
  • Clean Air Actno penalty
    formal · reported 2025-07-10

Environmental permits

source: Permit register
  • Clean Air Act permitted sourceVA0000005110774284
    NAICS 518210; ECHO compliance status: Violation w/in 1 Year
  • Clean Air Act permitted sourceVA0000005110774162
    NAICS 518210; ECHO compliance status: Violation w/in 1 Year
  • Clean Air Act permitted sourceVA0000005110774242
    NAICS 518210; ECHO compliance status: No Violation Identified
  • VA DEQ air permit (minor NSR)74338
    Diesel backup-generator air permit. Program: mNSR. Reg. 74338.
  • VA DEQ air permit (minor NSR)74284
    Diesel backup-generator air permit. Program: mNSR. Reg. 74284.
  • VA DEQ air permit (minor NSR)74287
    Diesel backup-generator air permit. Program: mNSR. Reg. 74287.
  • VA DEQ air permit (minor NSR)74242
    Diesel backup-generator air permit. Program: mNSR. Reg. 74242.
  • VA DEQ air permit (minor NSR)74162
    Diesel backup-generator air permit. Program: mNSR. Reg. 74162.

What this site costs the grid

source: PJM RPM auction reports
Dominion (Virginia / NC) · 2027/28 auction
$333 /MW-day
Peaked at $444/MW-day in 2025/26 1.65× the rest of PJM

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost (estimated)
$3M to $6.7M/yr

An estimated ~25 to 55 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Nearest school

source: HIFLD / NCES

The nearest public school, Guilford Elementary in Sterling, is 1.3 mi from this site (541 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.