Vantage Data Centers
45130 Vantage Data Plaza · Sterling, Loudoun County, VA
Source: OpenStreetMap
Vantage Data Centers is an operating data center in Loudoun County, VA, operated by Vantage Data Centers Holdings, LLC. DataCentersExposed has documented a 127,578 sq ft footprint and 2 tracked EPA enforcement records at this site.
Reporting by Eric Keller · Updated Jun 12, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkVantage Data Centers data center
Operator chain
- Ultimate parentVantage Data Centers Holdings, LLC
- Files asVantage Data Centers Holdings, LLC
- This facilityVantage Data Centers
In the news
source: Google News- Big Tech takes a drubbing in AlbanyPolitico· Jun 14, 2026
- After Virginia approved a gas-powered data center without public input, residents turned to a local environmental group for answersDC News Now· Jun 9, 2026
- Politicians avoid calling for data center bans despite public oppositionFinance & Commerce· Jun 8, 2026
- Voters back first-in-nation permanent data center ban in city near L.A.The Washington Post· Jun 5, 2026
- See where diesel-powered data center generators are polluting VirginiaThe Washington Post· May 28, 2026
- For residents of Virginia’s ‘data center alley,’ the industry underpins economy — but with costsTribLIVE.com· May 16, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Vantage Data Centers Holdings, LLC (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2021 · term — yr · source
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHO- Clean Air Actno penaltyformal · reported 2026-05-21
- Clean Air Actno penaltyformal · reported 2025-07-10
Environmental permits
source: Permit register- Clean Air Act permitted sourceVA0000005110774284NAICS 518210; ECHO compliance status: Violation w/in 1 Year
- Clean Air Act permitted sourceVA0000005110774162NAICS 518210; ECHO compliance status: Violation w/in 1 Year
- Clean Air Act permitted sourceVA0000005110774242NAICS 518210; ECHO compliance status: No Violation Identified
- VA DEQ air permit (minor NSR)74338Diesel backup-generator air permit. Program: mNSR. Reg. 74338.
- VA DEQ air permit (minor NSR)74284Diesel backup-generator air permit. Program: mNSR. Reg. 74284.
- VA DEQ air permit (minor NSR)74287Diesel backup-generator air permit. Program: mNSR. Reg. 74287.
- VA DEQ air permit (minor NSR)74242Diesel backup-generator air permit. Program: mNSR. Reg. 74242.
- VA DEQ air permit (minor NSR)74162Diesel backup-generator air permit. Program: mNSR. Reg. 74162.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~25 to 55 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Nearest school
source: HIFLD / NCESThe nearest public school, Guilford Elementary in Sterling, is 1.3 mi from this site (541 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.