Mapped (unverified)colocation
TM ONE IPDC, Johore
Iskandar Puteri, Johor, Malaysia
Source: Primary source
TM ONE IPDC, Johore is a mapped data center in Johor, Malaysia. It runs on Malaysia's grid, which was 79% fossil-fuelled at 603 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
603 gCO₂/kWh
Clean electricity
21%
Region
Johor
Overview
source: linkTelekom Malaysia Berhad (TM) — colocation facility (7 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
603 gCO₂/kWh
Clean electricity
21%
Fossil electricity
79%
National grid context, not this facility's own metering. Full country picture: Malaysia data centers.
In the news
source: Google News (local + English)- AI-ready TM Nxera data center in Johor on track for 2H 2026 rolloutLight Reading· Apr 17, 2026
- ‘Lesson’ for Malaysia’s Johor: Data centres should not be too near homes, says assemblyman after outcryAsia News Network· Mar 12, 2026
- TM Nxera Secures 280 MW Power Supply for AI-Ready Data Center Campus in JohorTelecom Review Asia· Jan 15, 2026
- Telekom Malaysia secures power supply for data centre in JohorThe Edge Malaysia· Jan 12, 2026
- TM Nxera partners with TNB to secure 280MW for data centre campusThe Star· Jan 12, 2026
- TM Nxera signs 280MW electrical supply agreement with TNB to power Malaysian data center campusData Center Dynamics· Jan 12, 2026
See something wrong or missing on this page? Suggest a correction.