Malaysia · state
Johor
DataCentersExposed tracks 1 AI data center in Johor, Malaysia — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 0 tracked operators.
Sources: Malaysia, Methodology
Tracked
1
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- Mapped (unverified)
In the local press
Johor data-center coverage
- Alibaba Cloud’s New Public Cloud Region in Johor Launched to Meet Growing DemandSME & Entrepreneurship Magazine· Jun 16, 2026
- ESR’s $1B Fund With China’s EXIM Bank Backs 510MW Johor Data Centre ProjectMingtiandi· Jun 15, 2026
- Singapore data center firm Racks Central expands in JohorTech in Asia· Jun 15, 2026
- Alibaba launches cloud region in Johor, MalaysiaData Center Dynamics· Jun 9, 2026
- Alibaba Cloud Opens Two Johor Data Centres as Cloud Demand Grows in MalaysiaFintech News Malaysia· Jun 9, 2026
- Malaysia’s gas-guzzling data centre boom clashes with its clean energy goalsSouth China Morning Post· Jun 7, 2026
Live headlines via Google News — in English and Malaysia's local press.