Mapped (unverified)
Gp3 Data Center
Johor, Malaysia
Source: OpenStreetMap
Gp3 Data Center is a mapped data center in Johor, Malaysia. It runs on Malaysia's grid, which was 79% fossil-fuelled at 603 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
603 gCO₂/kWh
Clean electricity
21%
Region
Johor
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
603 gCO₂/kWh
Clean electricity
21%
Fossil electricity
79%
National grid context, not this facility's own metering. Full country picture: Malaysia data centers.
In the news
source: Google News (local + English)- ZDATA tops green ranking, a first for data center in MalaysiaW.Media· Mar 12, 2026
- Developers and tech giants pour billions into Malaysia's data centre surgeNST Online· Nov 12, 2025
- ZDATA seeks US$ 500 million loan for Johor data center: ReportW.Media· Sep 12, 2025
- Chinese data centre firm Zdata seeks US$500mil private loanThe Star· Sep 12, 2025
- Zdata seeks $500m loan to fund Malaysia data center projectData Center Dynamics· Sep 12, 2025
- Chinese data centre firm Zdata seeks US$500 million private loan for Malaysia project: sourcesThe Business Times· Sep 11, 2025