Skip to content
DataCentersExposed
Mapped (unverified)

NEXTDC Kuala Lumpur Data Centre (KL1)

Petaling Jaya, Selangor, Malaysia

Source: OpenStreetMap

NEXTDC Kuala Lumpur Data Centre (KL1) is a mapped data center in Selangor, Malaysia, operated by NEXTDC. DataCentersExposed has documented a 69,117 sq ft footprint at this site. It runs on Malaysia's grid, which was 79% fossil-fuelled at 603 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
NEXTDC
Operator
NEXTDC
Est. capacity
~10-30 MW
Footprint
69,117 sq ft
Grid carbon
603 gCO₂/kWh
Clean electricity
21%
Region
Selangor
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

NEXTDC Kuala Lumpur Data Centre (KL1) is a data center in Petaling Jaya, Malaysia, operated by NEXTDC and listed in records as a NEXTDC Sdn Bhd facility. Its reported footprint is 69,117 square feet. Ownership above NEXTDC is not detailed in available records.

Operator chain

  • Ultimate parent
    NEXTDC
  • Files as
    NEXTDC
  • This facility
    NEXTDC Kuala Lumpur Data Centre (KL1)

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
603 gCO₂/kWh
Clean electricity
21%
Fossil electricity
79%

National grid context, not this facility's own metering. Full country picture: Malaysia data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.