Malaysia · state
Selangor
DataCentersExposed tracks 4 AI data centers in Selangor, Malaysia — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 1 tracked operator.
Sources: Malaysia, Methodology
Tracked
4
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
In the local press
Selangor data-center coverage
- Cabnet wins RM39m data centre containment contract in SelangorThe Malaysian Reserve· May 29, 2026
- NCT World signs term sheet for 100-acre land sale at NCT Smart Industrial Park for data centre developmentEdgeProp· May 11, 2026
- Malaysia: Selangor Aligns Data Centre Growth with Water and Energy SecurityOpenGov Asia· Apr 28, 2026
- Sunway Construction wins RM1.75 bil data centre job in SerendahThe Edge Malaysia· Apr 17, 2026
- SunCon bags RM1.75 bil contract to build hyperscale data centre in Bandar Serendah, SelangorEdgeProp· Apr 17, 2026
- IJM Corp Secures RM658 Million Data Centre Contract In SelangorBusinessToday Malaysia· Apr 1, 2026
Live headlines via Google News — in English and Malaysia's local press.