Mapped (unverified)colocation
Serverfarm TOR1 Toronto
North York, Ontario, Canada
Source: Primary source
Serverfarm TOR1 Toronto is a mapped data center in Ontario, Canada, operated by Serverfarm. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Serverfarm
Operator
Serverfarm
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Ontario
Overview
source: linkServerfarm — colocation facility (1 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentServerfarm
- Files asServerfarm
- This facilityServerfarm TOR1 Toronto
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Yondr energizes 27MW data center in Toronto, CanadaData Center Dynamics· Apr 22, 2026
- Manulife-Backed Serverfarm Plans 4MW Expansion at Toronto Data CentreConnect CRE Canada· Feb 3, 2026
- Serverfarm secures 23-lender $3bn credit facility for NAM DC developmentData Center Dynamics· Jan 30, 2026
- Largest AI data centre in the world to be built in northwest AlbertaCTV News· Dec 9, 2024
See something wrong or missing on this page? Suggest a correction.