Canada · province
Ontario
DataCentersExposed tracks 25 AI data centers in Ontario, Canada — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 7 tracked operators.
Sources: Canada, Methodology
Tracked
25
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- Mapped (unverified)
- Mapped (unverified)
- Ascent TOR1Ascent, LLCMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- CompassCompassMapped (unverified)
- Cyxtera Toronto YYZ1CyxteraMapped (unverified)
- Cyxtera Toronto YYZ2CyxteraMapped (unverified)
- Digital Realty Toronto YYZ10Digital Realty Trust, Inc.Mapped (unverified)
- Digital Realty Toronto YYZ11Digital Realty Trust, Inc.Mapped (unverified)
- Edgeconnex TorontoEdgeConneX, Inc.Mapped (unverified)
- Equinix Markham TR5Equinix, Inc.Mapped (unverified)
- Equinix TR1Equinix, Inc.Mapped (unverified)
- Equinix TR2Equinix, Inc.Mapped (unverified)
- Equinix TR6Equinix, Inc.Mapped (unverified)
- Equinix TR7Equinix, Inc.Mapped (unverified)
- Mapped (unverified)
- Ministry of Government Services Data CentreThe Government of OntarioMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
In the local press
Ontario data-center coverage
- Saskatoon's chamber of commerce wants in on the AI data centre rush — but would the price be worth it?CBC· Jun 15, 2026
- Building cleaner AI data centres better than not building at all, CEO behind Hamilton proposal saysCBC· Jun 15, 2026
- Bitdeer breaks ground on natural gas plant and data center in Alberta, CanadaData Center Dynamics· Jun 15, 2026
- Brooks residents seek info on the data centre megaproject planned right next doorCBC· Jun 13, 2026
- As the AI economy booms in the U.S., Canada sees a blipThe Globe and Mail· Jun 13, 2026
- Hamilton rejects plan to partition Stelco lands for AI data centreOntario Construction News· Jun 12, 2026
Live headlines via Google News — in English and Canada's local press.