Mapped (unverified)colocation
Bell Toronto
Toronto, Ontario, Canada
Source: Primary source
Bell Toronto is a mapped data center in Ontario, Canada, operated by Bell Canada. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Bell Canada
Operator
Bell Canada
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Ontario
Overview
source: linkBell Canada (formally Group Telecom) — colocation facility (6 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentBell Canada
- Files asBell Canada
- This facilityBell Toronto
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Bell and Canadian AI firm Cohere sign deal to operate models using Bell infrastructureCBC· Jun 18, 2026
- HIVE Stock Spikes as Bitcoin Miner Lands $220M AI Infra DealDecrypt· Jun 18, 2026
- Bell, Cohere sign deal to operate models using Bell AI Fabric infrastructureCastanet Kamloops· Jun 18, 2026
- Bell and Cohere team up to bolster Canada’s AI infrastructureThe Globe and Mail· Jun 18, 2026
- Bell Canada parent company slashing nearly 700 jobs as part of ongoing reorganizationCBC· Jun 15, 2026
- BUZZHPC builds one of Canada's largest AI gigafactories with 320 MW facility in Toronto areaCrypto Briefing· Jun 15, 2026
See something wrong or missing on this page? Suggest a correction.