Mapped (unverified)colocation
Neutral Networks Monterrey (MTY-NN)
Monterrey, Nuevo León, Mexico
Source: Primary source
Neutral Networks Monterrey (MTY-NN) is a mapped data center in Nuevo León, Mexico. It runs on Mexico's grid, which was 74% fossil-fuelled at 474 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
474 gCO₂/kWh
Clean electricity
26%
Region
Nuevo León
Overview
source: linkEven Group — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
474 gCO₂/kWh
Clean electricity
26%
Fossil electricity
74%
National grid context, not this facility's own metering. Full country picture: Mexico data centers.
In the news
source: Google News (local + English)- Axtel operará data center del Tec de Monterrey durante 12 añosMilenio· Apr 22, 2026
- Axtel reporta aumento en negocio empresarial y de gobierno, pero sufre pérdida netaEl Cronista· Apr 22, 2026
- Ikusi abre oficinas y CDT en MonterreyInfochannel· Mar 27, 2026
- Avances en la IA rebasan a la red energética de MéxicoEl Informador· Jan 17, 2026
- Telmex va a competirle a Amazon y Microsoft con nuevo centro de datos; así se compone el proyectoEL CEO· Nov 16, 2025
- Refuta NVIDIA a Samuel su inversión en centro de datos verde de IA en NLEl Financiero· Nov 13, 2025
See something wrong or missing on this page? Suggest a correction.