Mapped (unverified)colocation
KoloDC NL3
Apeldoorn, Gelderland, Netherlands
Source: Primary source
KoloDC NL3 is a mapped data center in Gelderland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Gelderland
Overview
source: linkKoloDC — colocation facility (14 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Belastingdienst scherpt aanbestedingsbeleid IT-projecten aanHet Financieele Dagblad· Jun 11, 2026
- Brandweer opnieuw naar datacenter Almere, maar dit keer zijn ze snel vertrokkenAD.nl· May 14, 2026
- Kamervragen over mogelijkheid tot stoppen met Amerikaans btw-systeemComputable.nl· Mar 4, 2026
- Ongeloof over beslissing Belastingdienst om btw-software aan VS uit te besteden: ‘Onbestaanbaar’Welingelichte Kringen· Feb 27, 2026
- Belastingdienst gaat door met overstap naar Microsoft 365ictmagazine.nl· Feb 16, 2026
- Duizenden servers in beslaggenomen in omvangrijk cybercrime onderzoekPolitie.nl· Nov 14, 2025
See something wrong or missing on this page? Suggest a correction.