Mapped (unverified)
Cellnex
Gelderland, Netherlands
Source: OpenStreetMap
Cellnex is a mapped data center in Gelderland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Gelderland
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Datacenters slurpen steeds meer stroom van overbelast net en einde is niet in zicht: ‘De last is voor de burger’De Limburger· Apr 22, 2024
- Cellnex neemt Media Gateway-datacenter over van Red BeeDutch IT Channel· Apr 7, 2023
- Cellnex vult behoefte van datacenter ruimte zo goed mogelijk inDutch IT Channel· Mar 15, 2022
- Cellnex levert datacenter aan Toren7 in haar telecom- en datatoren van RoermondEmerce· Jun 24, 2021
- Het dubbelleven van de televisietorensNRC· Nov 27, 2020
- Cellnex gaat datacenter bouwen in zendmast Loon op ZandMediaMagazine.· Dec 15, 2019