Mapped (unverified)colocation
Bit-1
Ede, Gelderland, Netherlands
Source: Primary source
Bit-1 is a mapped data center in Gelderland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Gelderland
Overview
source: linkBIT BV — colocation facility (11 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Lokale zzp’ers ontdekken een nieuwe inkomstenbron via webdienstenTelstar-online· May 8, 2026
- Kort: Epe meldt cyberinbraak, Twente krijgt fotonica-fabriek (en meer)Computable.nl· Mar 16, 2026
- De AI-race kan niet zonder fotonische chips, en laat Nederland daar nu net in vooroplopenMT/Sprout· Mar 12, 2026
- Eindhovense start-up pakt probleem in AI-datacenters aan: ’Chips sneller laten communiceren’De Telegraaf· Mar 9, 2026
- Fotonica-fabriek: dankzij AI-chips ziet Eindhoven opnieuw het lichtNRC· Mar 9, 2026
- Nederland bouwt verder aan fotonische chips met nieuwe productielijn op High Tech CampusTW.nl· Mar 9, 2026
See something wrong or missing on this page? Suggest a correction.