Skip to content
DataCentersExposed
Mapped (unverified)

Hume 4

Australian Capital Territory, Australia

Source: OpenStreetMap

Hume 4 is a mapped data center in Australian Capital Territory, Australia, operated by CDC Data Centres. DataCentersExposed has documented a 102,509 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
CDC Data Centres
Operator
CDC Data Centres
Est. capacity
~20-45 MW
Footprint
102,509 sq ft
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Australian Capital Territory
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Hume 4 is a mapped data center in Australia, operated by CDC Data Centres, also known as Canberra Data Centres. Its reported footprint is 102,509 square feet. Available records do not name an ultimate parent above CDC Data Centres.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%

National grid context, not this facility's own metering. Full country picture: Australia data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.