CDC Hume Datacentre 1

Australian Capital Territory, Australia

Source: OpenStreetMap

CDC Hume Datacentre 1 is a mapped data center in Australian Capital Territory, Australia, operated by CDC Data Centres. DataCentersExposed has documented a 27,558 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
CDC Data Centres
Operator
CDC Data Centres
Est. capacity
~5-15 MW
Footprint
27,558 sq ft
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Australian Capital Territory
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

CDC Hume Datacentre 1 is a mapped data center in Australia, operated by CDC Data Centres. Available records put its footprint at 27,558 square feet. No ultimate parent above CDC Data Centres is identified in the facts on hand.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%

National grid context, not this facility's own metering. Full country picture: Australia data centers.