CDC Hume Datacentre 2
Australian Capital Territory, Australia
Source: OpenStreetMap
CDC Hume Datacentre 2 is a mapped data center in Australian Capital Territory, Australia, operated by CDC Data Centres. DataCentersExposed has documented a 18,715 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkCDC Hume Datacentre 2 is a mapped data center in Australia, operated by CDC Data Centres. Available records put its footprint at 18,715 square feet. No ultimate parent company is disclosed in the available records for the site.
Operator chain
- Ultimate parentCDC Data Centres
- Files asCDC Data Centres
- This facilityCDC Hume Datacentre 2
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Australia’s Monash University launches supercomputer at CDC data centerData Center Dynamics· Jun 11, 2026
- Aussie bond market lures AI borrowers from Canberra to DallasAFR· Jun 4, 2026
- Seizing the opportunity to do data centres rightClimate Council· Jun 3, 2026
- Report: AI could drive up Australian power prices by 26% by 2035Startup Daily· Jun 3, 2026
- From corporate boxes to tech billionaires: Inside the Allan government’s data centre courtshipBrisbane Times· Jun 1, 2026
- First trade deficit in nine years amid data centre boomThe West Australian· Jun 1, 2026